Classification and Regression with the BigML Dashboard

3.11 Moving Linear Regressions to Another Project

When you create a linear regression, it will be assigned to the same Project where the original dataset is located.

linear regressions can only be assigned to a single project. However, you can move linear regressions between projects. The menu option to do this can be found in two places:

  1. From the linear regression list, in either the chart view or table view, click the move to... option within the 1-click action menu and select another project or create a new one. (See Figure 3.110 .)

    \includegraphics[]{images/linearregression/lnr-projects-oneclick}
    Figure 3.110 Change project from 1-click action menu
  2. In the linear regression list view, click the move to... option within the pop up menu and select another project or create a new one. (See Figure 3.111 .)

    \includegraphics[]{images/linearregression/lnr-projects-popup}
    Figure 3.111 Change project from pop up menu